Nylon Dog Leash Large Dog Training Leash Reflective Pet Long Leads Walking Rope Heavy Duty For French Bulldog Padded Handle

Vimost Shop

£38.88 (Inc. VAT Tax)
£32.40 (Ex. VAT Tax)
(No reviews yet) Write a Review

Nylon Dog Leash Large Dog Training Leash Reflective Pet Long Leads Walking Rope Heavy Duty For French Bulldog Padded Handle

Type: Leashes
Dog Leash Type: Basic Leashes
Origin: CN(Origin)
Material: Nylon
Season: All seasons
Pattern: Solid
Feature: Reflective
Feature: Padded
Type: Dog Leash
Width: 1.2cm(1/2inch )
Length: 150cm(5ft)
Feature: Reflective , Heavy Duty
Applicable Breeeds: Medium and Large Dogs
Suitable for: Climbing,Walking ,Training,Running
Handle: Padded
Colors: Black,Blue,Red